Status: 
Green/Open

Large tree down in the middle of the main descent, is now ramped thanks to the busy bee. The entire length of the trail has been raked in the last 2 weeks.
The realign on the descent features some sweet berms, I would have taken photos but I was having too much fun to stop.
The trail is running really fast, heaps of fun!